All industries
Marinas, berths & storage yards

Allocated by length.
Invoiced by the month.

Berths, pens, hardstand and storage bays — held for the holder, sized to what actually fits, billed once a month, with insurance and survey certificates chased on their own. The software most yards are still doing in a ledger.

How most yards
actually run

A berth plan on the office wall with names in pencil. Annual fees arriving as bank transfers with no reference, reconciled by memory. A waiting list in a notebook that nobody trusts. Certificates of currency in a drawer, checked when something goes wrong rather than before. And the only person who knows which pens take a 14-metre hull has worked there for twenty years.

Nothing here is
market jargon

Your portal is configured to your yard at setup. Your holders never see stallholder terminology.

In your marina or yard In TEKRAM
Annual berth holders Permanent holders with a held berth, retained rate and one monthly invoice
Casual and visitor berthing Casual bookings, self-served and paid online
A 14m vessel cannot take a 12m berth Length-based fit validation — the booking is refused, not corrected later
Berth classes — marina, pen, swing, hardstand Space types, each with its own quantity, rate and visibility switch
Power and water pedestals Add-on stock counted as a finite pool, so services cannot be oversold
Vessel insurance and survey certificates Compliance documents with automatic expiry chasing and booking blocks
The berth plan on the office wall Live allocation with clash detection
The waiting list in a notebook A queue that offers the next freed berth on its own, in order

Built for holders
who stay for years

Annual holders, one invoice a month

Berth and bay holders are billed a month or a quarter at a time as one linked batch sharing a single invoice, a single due date, their held position and their retained rate. One summary email, one payment — not one message per period.

Length and beam, enforced not assumed

Record what each berth or bay actually is — length, beam, draft, class — and the system refuses a booking that will not fit. It is the same frontage check that stops a 12m trade site landing on a 3m space, applied to a hull instead of a gazebo.

Services counted as real stock

Power pedestals, water points and hardstand slots are finite. Set what you physically have and the booking form stops selling the one you do not. Per-period overrides for the season half the pedestals are being replaced.

Insurance and survey that cannot lapse

Holders upload their own certificates of currency and survey documents. Expiring and expired notices go out daily to them and to you. Turn on booking blocks and an uninsured vessel cannot renew until it is current.

Overdue handled without a conversation

Miss the due date and the reminder goes out on its own. Seven days later the held berth and the retained rate release back to general availability, automatically and reversibly. When the payment lands, restore it in one click.

Money into your account, not ours

Card payments land in your own Stripe account on your own payout schedule. TEKRAM never holds, receives or handles your money and never takes a percentage of a berth fee. Cash and transfer are recorded with a full audit trail.

Storage yards are the same problem

A caravan storage yard, a boat hardstand, a container compound and a marina are all doing one thing: holding a numbered space of a specific size for someone who pays monthly and stays for years.

Set your bays by dimension, let the fit check refuse anything too long, and bill the whole yard in one action each month. If you run both a marina and a hardstand, they are two space types in the same system rather than two systems.

Where we are not there yet

Gate and access-card integration is not built. If entry control is a hard requirement, TEKRAM will not replace it and we will say so at the first conversation.

Pro-rata billing for a mid-month start, and bond or deposit handling as a distinct transaction, are on the roadmap rather than in the product. Slipway bookings, lifts and maintenance scheduling are out of scope entirely.

What it costs

Yards do not measure usage in event dates per month, so our published tiers will not map cleanly to how you operate. Pricing is based on the number of berths or bays under management and how many staff need portal access.

Every engagement includes configuration of your berth and bay classes, dimensions, rates and service stock, migration of your existing holder register, and a written operations manual for your team. Tell us how many berths or bays you manage and we will quote against that.

Get the berth plan off the wall

Tell us how your holders are managed now and we will show you what next month’s invoicing looks like.